Updated: 25 October 2026

Project status and roadmap

The periods below are work targets. A milestone is announced as delivered only after its results and scope have been checked.

Available

Minimal server trial

A 40.9 MB Windows package with minimal administration. Its own release details define prerequisites and limitations.

View the download

Scoped private validation

Candidates and workshops

Private candidates have native checks, administration workflows and endurance results. These do not automatically validate the public trial or every client.

View local tools

To be validated

Capacity and headset VR

Licence caps are not performance measurements. The 90 FPS target requires headset measurements on a specified scene and hardware.

Planned work

25–31 October 2026 · Planned

Consolidate the playable workflow

Bring accounts, characters, world entry, inventory and reconnection together in one identified Nethercore composition.

Exit criterion: A reproducible real workflow with durable data and explicit limitations.

1–8 November 2026 · Planned

Validate two-client sessions

Test two actual graphical clients, reconnections and persistence over short and then sustained observations.

Exit criterion: Measured durations and independently checked durable data.

9–15 November 2026 · Planned

Connect the workshops to one small game area

Compose a small area with a building, vegetation and a creature from the tools, then verify exports, engine loading and interactions.

Exit criterion: A source → export → engine → save workflow with inspected rendering.

16–22 November 2026 · Planned

Prepare operations and measure load

Check installation, rollback, backup/restore and administration. Measure load on specified hardware and scenes.

Exit criterion: An observed restore and measurements matching the stated scenario.

23–30 November 2026 · Planned

Validate VR and review delivery packages

Measure rendering on an OpenXR headset when hardware is available. Review the server, Nethercore and VR separately, together with media provenance and distributable versions.

Exit criterion: A delivery decision for each package; the calendar alone does not imply public availability.

Delivery decisions are made separately for server/WebAdmin, Nethercore and OpenXR/VR. An unmet gate stays identified as such. Dates are not a commercial release promise.